US Bridges

I-95 over I-195 WB to I-95 SB

Good

Miami-Dade County, Florida · I-95/SR112/I-195 Intrchg · Structure no. 870340

Built
1962
63 years old, rebuilt 2010
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
247 ft
3 main spans
Daily traffic
179,000
2024 count
Owner
State
State Highway Agency

About this bridge

I-95 over I-195 WB to I-95 SB is a prestressed concrete stringer/multi-beam or girder carrying I-95 over I-195 WB to I-95 SB in Miami-Dade County, Florida. It was built in 1962 and reconstructed in 2010, so it is 63 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 179,000 vehicles a day, roughly 5% of them trucks, projected to reach 310,565 by 2042. The structure is 247 ft (75.3 m) long and 155 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesI-95
CrossesI-195 WB to I-95 SB
LocationI-95/SR112/I-195 Intrchg
RouteInterstate 95
StateFlorida
Coordinates25.811, -80.20599
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating42.5 US tons
Inventory rating38.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length247 ft (75.3 m)
Longest span95 ft (29 m)
Deck width155 ft (47.2 m)
Roadway width149 ft (45.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic179,000 (2024)
Projected traffic310,565 by 2042
Trucks5%
Lanes on structure10
Traffic directionTwo-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-95 over I-195 WB to I-95 SB built?

It was built in 1962, making it 63 years old in 2025. It was reconstructed in 2010.

What condition is I-95 over I-195 WB to I-95 SB in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does I-95 over I-195 WB to I-95 SB carry?

About 179,000 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is I-95 over I-195 WB to I-95 SB?

The structure is 247 ft (75.3 m) long with a longest span of 95 ft (29 m) and a deck 155 ft wide.

Who owns I-95 over I-195 WB to I-95 SB?

It is owned by the State Highway Agency.