US Bridges

I-95 NB (870339) over US-27 & NW 35 ST

Good

Miami-Dade County, Florida · I-95/SR-112/I-195 Intrchg · Structure no. 870533

Built
1962
63 years old, rebuilt 2010
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
288 ft
5 main spans
Daily traffic
89,500
2023 count
Owner
State
State Highway Agency

About this bridge

I-95 NB (870339) over US-27 & NW 35 ST is a prestressed concrete stringer/multi-beam or girder carrying I-95 NB (870339) over US-27 & NW 35 ST in Miami-Dade County, Florida. It was built in 1962 and reconstructed in 2010, so it is 63 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 89,500 vehicles a day, roughly 5% of them trucks, projected to reach 155,282 by 2042. The structure is 288 ft (87.8 m) long and 78 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI-95 NB (870339)
CrossesUS-27 & NW 35 ST
LocationI-95/SR-112/I-195 Intrchg
RouteInterstate 95
StateFlorida
Coordinates25.8095, -80.20581
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating43.7 US tons
Inventory rating38.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans5
Design loadHL 93
Structure length288 ft (87.8 m)
Longest span72 ft (22 m)
Deck width78 ft (23.8 m)
Roadway width75 ft (22.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic89,500 (2023)
Projected traffic155,282 by 2042
Trucks5%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-95 NB (870339) over US-27 & NW 35 ST built?

It was built in 1962, making it 63 years old in 2025. It was reconstructed in 2010.

What condition is I-95 NB (870339) over US-27 & NW 35 ST in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does I-95 NB (870339) over US-27 & NW 35 ST carry?

About 89,500 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is I-95 NB (870339) over US-27 & NW 35 ST?

The structure is 288 ft (87.8 m) long with a longest span of 72 ft (22 m) and a deck 78 ft wide.

Who owns I-95 NB (870339) over US-27 & NW 35 ST?

It is owned by the State Highway Agency.