US Bridges

I-195 EB to I-95SB over US 441 (nw 7 Ave)

Good

Miami-Dade County, Florida · I-95/SR112/I-195 Intrchg · Structure no. 870343

Built
1962
63 years old, rebuilt 2020
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
159 ft
3 main spans
Daily traffic
11,000
2023 count
Owner
State
State Highway Agency

About this bridge

I-195 EB to I-95SB over US 441 (nw 7 Ave) is a prestressed concrete stringer/multi-beam or girder carrying I-195 EB to I-95SB over US 441 (nw 7 Ave) in Miami-Dade County, Florida. It was built in 1962 and reconstructed in 2020, so it is 63 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,000 vehicles a day, roughly 11% of them trucks, projected to reach 19,085 by 2042. The structure is 159 ft (48.6 m) long and 34 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesI-195 EB to I-95SB
CrossesUS 441 (nw 7 Ave)
LocationI-95/SR112/I-195 Intrchg
RouteInterstate 195
StateFlorida
Coordinates25.81164, -80.20747
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating62.6 US tons
Inventory rating48.6 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length159 ft (48.6 m)
Longest span73 ft (22.3 m)
Deck width34 ft (10.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,000 (2023)
Projected traffic19,085 by 2042
Trucks11%
Lanes on structure1
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-195 EB to I-95SB over US 441 (nw 7 Ave) built?

It was built in 1962, making it 63 years old in 2025. It was reconstructed in 2020.

What condition is I-195 EB to I-95SB over US 441 (nw 7 Ave) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does I-195 EB to I-95SB over US 441 (nw 7 Ave) carry?

About 11,000 vehicles per day (2023 count), of which roughly 11% are trucks.

How long is I-195 EB to I-95SB over US 441 (nw 7 Ave)?

The structure is 159 ft (48.6 m) long with a longest span of 73 ft (22.3 m) and a deck 34 ft wide.

Who owns I-195 EB to I-95SB over US 441 (nw 7 Ave)?

It is owned by the State Highway Agency.