US Bridges

I-95 SB over I-195 (SR-112)

Good

Miami-Dade County, Florida · I-95/SR112/I-195 Intrchg · Structure no. 870324

Built
1961
64 years old
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
172 ft
4 main spans
Daily traffic
89,500
2024 count
Owner
State
State Highway Agency

About this bridge

I-95 SB over I-195 (SR-112) is a prestressed concrete stringer/multi-beam or girder carrying I-95 SB over I-195 (SR-112) in Miami-Dade County, Florida. It was built in 1961, so it is 64 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 89,500 vehicles a day, roughly 5% of them trucks, projected to reach 155,282 by 2042. The structure is 172 ft (52.4 m) long and 70 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI-95 SB
CrossesI-195 (SR-112)
LocationI-95/SR112/I-195 Intrchg
RouteInterstate 95
StateFlorida
Coordinates25.81244, -80.20617
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55.8 US tons
Inventory rating49.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length172 ft (52.4 m)
Longest span45 ft (13.7 m)
Deck width70 ft (21.3 m)
Roadway width67 ft (20.4 m)
Vertical clearance over deck18 ft (5.4 m)

Traffic and service

Average daily traffic89,500 (2024)
Projected traffic155,282 by 2042
Trucks5%
Lanes on structure5
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn an Interstate toll segment under Secretarial agreement
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-95 SB over I-195 (SR-112) built?

It was built in 1961, making it 64 years old in 2025.

What condition is I-95 SB over I-195 (SR-112) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does I-95 SB over I-195 (SR-112) carry?

About 89,500 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is I-95 SB over I-195 (SR-112)?

The structure is 172 ft (52.4 m) long with a longest span of 45 ft (13.7 m) and a deck 70 ft wide.

Who owns I-95 SB over I-195 (SR-112)?

It is owned by the State Highway Agency.