US Bridges

I-95 NB to I-195WB over I-95 & I-195 & Ramps

Good

Miami-Dade County, Florida · I-95/SR112/I-195 Intrchg · Structure no. 870332

Built
1961
64 years old, rebuilt 2010
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
1,126 ft
2 main spans
Daily traffic
10,000
2022 count
Owner
State
State Highway Agency

About this bridge

I-95 NB to I-195WB over I-95 & I-195 & Ramps is a steel continuous stringer/multi-beam or girder carrying I-95 NB to I-195WB over I-95 & I-195 & Ramps in Miami-Dade County, Florida. It was built in 1961 and reconstructed in 2010, so it is 64 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,000 vehicles a day, roughly 11% of them trucks, projected to reach 17,350 by 2044. The structure is 1,126 ft (343.2 m) long and 34 ft wide. If it were closed, the detour would be 4.3 mi (7 km).

CarriesI-95 NB to I-195WB
CrossesI-95 & I-195 & Ramps
LocationI-95/SR112/I-195 Intrchg
RouteInterstate 195
StateFlorida
Coordinates25.81195, -80.20569
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating69.4 US tons
Inventory rating39.6 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2 (+14 approach)
Design loadHL 93
Structure length1,126 ft (343.2 m)
Longest span156 ft (47.5 m)
Deck width34 ft (10.5 m)
Roadway width31 ft (9.4 m)
Vertical clearance over deck21 ft (6.4 m)

Traffic and service

Average daily traffic10,000 (2022)
Projected traffic17,350 by 2044
Trucks11%
Lanes on structure1
Traffic directionOne-way traffic
CarriesThird level (interchange)
CrossesHighway
Detour if closed4.3 mi (7 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-95 NB to I-195WB over I-95 & I-195 & Ramps built?

It was built in 1961, making it 64 years old in 2025. It was reconstructed in 2010.

What condition is I-95 NB to I-195WB over I-95 & I-195 & Ramps in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does I-95 NB to I-195WB over I-95 & I-195 & Ramps carry?

About 10,000 vehicles per day (2022 count), of which roughly 11% are trucks.

How long is I-95 NB to I-195WB over I-95 & I-195 & Ramps?

The structure is 1,126 ft (343.2 m) long with a longest span of 156 ft (47.5 m) and a deck 34 ft wide.

Who owns I-95 NB to I-195WB over I-95 & I-195 & Ramps?

It is owned by the State Highway Agency.