SR-869SB to I-75NB over SR-84 WB & New River
GoodBroward County, Florida · I-595/I-75 Interchange · Structure no. 860509
- Built
- 1989
- 36 years old
- Condition
- Good
- inspected August 2023
- Type
- Segmental Box Girder
- Prestressed Concrete Continuous
- Length
- 460 ft
- 4 main spans
- Daily traffic
- 7,300
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR-869SB to I-75NB over SR-84 WB & New River is a prestressed concrete continuous segmental box girder carrying SR-869SB to I-75NB over SR-84 WB & New River in Broward County, Florida. It was built in 1989, so it is 36 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 7,300 vehicles a day, roughly 6% of them trucks, projected to reach 12,666 by 2042. The structure is 460 ft (140.2 m) long and 43 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR-869SB to I-75NB over SR-84 WB & New River built?
It was built in 1989, making it 36 years old in 2025.
What condition is SR-869SB to I-75NB over SR-84 WB & New River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does SR-869SB to I-75NB over SR-84 WB & New River carry?
About 7,300 vehicles per day (2023 count), of which roughly 6% are trucks.
How long is SR-869SB to I-75NB over SR-84 WB & New River?
The structure is 460 ft (140.2 m) long with a longest span of 172 ft (52.4 m) and a deck 43 ft wide.
Who owns SR-869SB to I-75NB over SR-84 WB & New River?
It is owned by the State Highway Agency.