US Bridges

WB 595 to NB SR869 over WB SR84 & New River Cnl

Fair

Broward County, Florida · I-75/SR869/I-595 Interchg · Structure no. 860510

Built
1988
37 years old
Condition
Fair
inspected August 2023
Type
Segmental Box Girder
Prestressed Concrete Continuous
Length
499 ft
4 main spans
Daily traffic
11,000
2023 count
Owner
State
State Highway Agency

About this bridge

WB 595 to NB SR869 over WB SR84 & New River Cnl is a prestressed concrete continuous segmental box girder carrying WB 595 to NB SR869 over WB SR84 & New River Cnl in Broward County, Florida. It was built in 1988, so it is 37 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 11,000 vehicles a day, roughly 8% of them trucks, projected to reach 19,085 by 2042. The structure is 499 ft (152.1 m) long and 43 ft wide.

CarriesWB 595 to NB SR869
CrossesWB SR84 & New River Cnl
LocationI-75/SR869/I-595 Interchg
RouteInterstate 75
StateFlorida
Coordinates26.12213, -80.34292
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating66.6 US tons
Inventory rating39.6 US tons

Structure

Structure typeSegmental Box Girder
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length499 ft (152.1 m)
Longest span182 ft (55.5 m)
Deck width43 ft (13 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,000 (2023)
Projected traffic19,085 by 2042
Trucks8%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and waterway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was WB 595 to NB SR869 over WB SR84 & New River Cnl built?

It was built in 1988, making it 37 years old in 2025.

What condition is WB 595 to NB SR869 over WB SR84 & New River Cnl in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.

How much traffic does WB 595 to NB SR869 over WB SR84 & New River Cnl carry?

About 11,000 vehicles per day (2023 count), of which roughly 8% are trucks.

How long is WB 595 to NB SR869 over WB SR84 & New River Cnl?

The structure is 499 ft (152.1 m) long with a longest span of 182 ft (55.5 m) and a deck 43 ft wide.

Who owns WB 595 to NB SR869 over WB SR84 & New River Cnl?

It is owned by the State Highway Agency.