NB I-75 to NB 869 over SR-84 WB and New River
GoodBroward County, Florida · I-75/I-595 Interchange · Structure no. 860519
- Built
- 1988
- 37 years old
- Condition
- Good
- inspected August 2023
- Type
- Segmental Box Girder
- Prestressed Concrete Continuous
- Length
- 387 ft
- 4 main spans
- Daily traffic
- 42,500
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
NB I-75 to NB 869 over SR-84 WB and New River is a prestressed concrete continuous segmental box girder carrying NB I-75 to NB 869 over SR-84 WB and New River in Broward County, Florida. It was built in 1988, so it is 37 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 42,500 vehicles a day, roughly 6% of them trucks, projected to reach 73,738 by 2042. The structure is 387 ft (117.9 m) long and 59 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NB I-75 to NB 869 over SR-84 WB and New River built?
It was built in 1988, making it 37 years old in 2025.
What condition is NB I-75 to NB 869 over SR-84 WB and New River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does NB I-75 to NB 869 over SR-84 WB and New River carry?
About 42,500 vehicles per day (2023 count), of which roughly 6% are trucks.
How long is NB I-75 to NB 869 over SR-84 WB and New River?
The structure is 387 ft (117.9 m) long with a longest span of 140 ft (42.8 m) and a deck 59 ft wide.
Who owns NB I-75 to NB 869 over SR-84 WB and New River?
It is owned by the State Highway Agency.