NB I-75 from SR869 over I-595 WB Ramp

Good

Broward County, Florida · NB I75 Ramp from SR869 SB · Structure no. 860641

Built
2008
17 years old
Condition
Good
inspected March 2023
Type
Slab
Prestressed Concrete
Length
64 ft
1 main span
Daily traffic
7,300
2023 count
Owner
State
State Highway Agency

About this bridge

NB I-75 from SR869 over I-595 WB Ramp is a prestressed concrete slab carrying NB I-75 from SR869 over I-595 WB Ramp in Broward County, Florida. It was built in 2008, so it is 17 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,300 vehicles a day, roughly 8% of them trucks, projected to reach 12,666 by 2042. The structure is 64 ft (19.4 m) long and 44 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesNB I-75 from SR869
CrossesI-595 WB Ramp
LocationNB I75 Ramp from SR869 SB
RouteInterstate 75
StateFlorida
Coordinates26.12186, -80.34853
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating45.7 US tons
Inventory rating38.5 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHL 93
Structure length64 ft (19.4 m)
Longest span64 ft (19.4 m)
Deck width44 ft (13.3 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,300 (2023)
Projected traffic12,666 by 2042
Trucks8%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was NB I-75 from SR869 over I-595 WB Ramp built?

It was built in 2008, making it 17 years old in 2025.

What condition is NB I-75 from SR869 over I-595 WB Ramp in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does NB I-75 from SR869 over I-595 WB Ramp carry?

About 7,300 vehicles per day (2023 count), of which roughly 8% are trucks.

How long is NB I-75 from SR869 over I-595 WB Ramp?

The structure is 64 ft (19.4 m) long with a longest span of 64 ft (19.4 m) and a deck 44 ft wide.

Who owns NB I-75 from SR869 over I-595 WB Ramp?

It is owned by the State Highway Agency.