US Bridges

IH 369NB to IH3OWB over IH 30 & Pavilion Pkwy

Good

Bowie County, Texas · 2.12 MI SW of SH 93 · Structure no. 190190061007209

Built
2010
15 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
1,559 ft
2 main spans
Daily traffic
19,410
2012 count
Owner
State
State Highway Agency

About this bridge

IH 369NB to IH3OWB over IH 30 & Pavilion Pkwy is a steel continuous stringer/multi-beam or girder carrying IH 369NB to IH3OWB over IH 30 & Pavilion Pkwy in Bowie County, Texas. It was built in 2010, so it is 15 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 19,410 vehicles a day, roughly 4% of them trucks, projected to reach 26,800 by 2032. The structure is 1,559 ft (475.2 m) long and 38 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesIH 369NB to IH3OWB
CrossesIH 30 & Pavilion Pkwy
Location2.12 MI SW of SH 93
StateTexas
Coordinates33.45195, -94.09843
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2 (+12 approach)
Design loadHS 25 or greater
Structure length1,559 ft (475.2 m)
Longest span170 ft (51.8 m)
Deck width38 ft (11.6 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic19,410 (2012)
Projected traffic26,800 by 2032
Trucks4%
Lanes on structure2
Traffic directionOne-way traffic
CarriesThird level (interchange)
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IH 369NB to IH3OWB over IH 30 & Pavilion Pkwy built?

It was built in 2010, making it 15 years old in 2025.

What condition is IH 369NB to IH3OWB over IH 30 & Pavilion Pkwy in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does IH 369NB to IH3OWB over IH 30 & Pavilion Pkwy carry?

About 19,410 vehicles per day (2012 count), of which roughly 4% are trucks.

How long is IH 369NB to IH3OWB over IH 30 & Pavilion Pkwy?

The structure is 1,559 ft (475.2 m) long with a longest span of 170 ft (51.8 m) and a deck 38 ft wide.

Who owns IH 369NB to IH3OWB over IH 30 & Pavilion Pkwy?

It is owned by the State Highway Agency.