IH369NB to IH30 EB over IH 30 Ebfr
FairBowie County, Texas · 0.55 MI N of US 82 · Structure no. 190190061007141
- Built
- 2010
- 15 years old
- Condition
- Fair
- inspected September 2022
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 1,401 ft
- 14 main spans
- Daily traffic
- 19,140
- 2012 count
- Owner
- State
- State Highway Agency
About this bridge
IH369NB to IH30 EB over IH 30 Ebfr is a prestressed concrete stringer/multi-beam or girder carrying IH369NB to IH30 EB over IH 30 Ebfr in Bowie County, Texas. It was built in 2010, so it is 15 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 19,140 vehicles a day, roughly 4% of them trucks, projected to reach 26,800 by 2032. The structure is 1,401 ft (427 m) long and 38 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH369NB to IH30 EB over IH 30 Ebfr built?
It was built in 2010, making it 15 years old in 2025.
What condition is IH369NB to IH30 EB over IH 30 Ebfr in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2022.
How much traffic does IH369NB to IH30 EB over IH 30 Ebfr carry?
About 19,140 vehicles per day (2012 count), of which roughly 4% are trucks.
How long is IH369NB to IH30 EB over IH 30 Ebfr?
The structure is 1,401 ft (427 m) long with a longest span of 105 ft (32 m) and a deck 38 ft wide.
Who owns IH369NB to IH30 EB over IH 30 Ebfr?
It is owned by the State Highway Agency.