US Bridges

IH 30EB to IH369SB over IH30 Ebfr & Pavilion Pwy

Good

Bowie County, Texas · 1.20 MI E of FM 2878 · Structure no. 190190061007202

Built
2010
15 years old
Condition
Good
inspected September 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
1,890 ft
18 main spans
Daily traffic
14,575
2011 count
Owner
State
State Highway Agency

About this bridge

IH 30EB to IH369SB over IH30 Ebfr & Pavilion Pwy is a prestressed concrete stringer/multi-beam or girder carrying IH 30EB to IH369SB over IH30 Ebfr & Pavilion Pwy in Bowie County, Texas. It was built in 2010, so it is 15 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 14,575 vehicles a day, roughly 15% of them trucks, projected to reach 20,405 by 2031. The structure is 1,890 ft (576.1 m) long and 28 ft wide.

CarriesIH 30EB to IH369SB
CrossesIH30 Ebfr & Pavilion Pwy
Location1.20 MI E of FM 2878
RouteInterstate 30
StateTexas
Coordinates33.45155, -94.10224
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61 US tons
Inventory rating45 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans18
Design loadHS 25 or greater
Structure length1,890 ft (576.1 m)
Longest span105 ft (32 m)
Deck width28 ft (8.4 m)
Roadway width26 ft (7.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic14,575 (2011)
Projected traffic20,405 by 2031
Trucks15%
Lanes on structure1
Traffic directionOne-way traffic
CarriesThird level (interchange)
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IH 30EB to IH369SB over IH30 Ebfr & Pavilion Pwy built?

It was built in 2010, making it 15 years old in 2025.

What condition is IH 30EB to IH369SB over IH30 Ebfr & Pavilion Pwy in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2022.

How much traffic does IH 30EB to IH369SB over IH30 Ebfr & Pavilion Pwy carry?

About 14,575 vehicles per day (2011 count), of which roughly 15% are trucks.

How long is IH 30EB to IH369SB over IH30 Ebfr & Pavilion Pwy?

The structure is 1,890 ft (576.1 m) long with a longest span of 105 ft (32 m) and a deck 28 ft wide.

Who owns IH 30EB to IH369SB over IH30 Ebfr & Pavilion Pwy?

It is owned by the State Highway Agency.