US Bridges

Ramp B S.B. Off over Aramingo Ave (nb) Spur a

Good

Philadelphia County, Pennsylvania · Girard AVE.INTERC.3591A05 · Structure no. 000000000057490

Built
2020
5 years old
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
782 ft
6 main spans
Daily traffic
12,240
2024 count
Owner
State
State Highway Agency

About this bridge

Ramp B S.B. Off over Aramingo Ave (nb) Spur a is a prestressed concrete continuous stringer/multi-beam or girder carrying Ramp B S.B. Off over Aramingo Ave (nb) Spur a in Philadelphia County, Pennsylvania. It was built in 2020, so it is 5 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 12,240 vehicles a day, roughly 6% of them trucks, projected to reach 9,838 by 2032. The structure is 782 ft (238.4 m) long and 50 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesRamp B S.B. Off
CrossesAramingo Ave (nb) Spur a
LocationGirard AVE.INTERC.3591A05
RouteState Highway 0
Coordinates39.97344, -75.12137
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating56.4 US tons
Inventory rating43.2 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans6
Design loadHL 93
Structure length782 ft (238.4 m)
Longest span134 ft (40.8 m)
Deck width50 ft (15.2 m)
Roadway width29 ft (8.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,240 (2024)
Projected traffic9,838 by 2032
Trucks6%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ramp B S.B. Off over Aramingo Ave (nb) Spur a built?

It was built in 2020, making it 5 years old in 2025.

What condition is Ramp B S.B. Off over Aramingo Ave (nb) Spur a in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Ramp B S.B. Off over Aramingo Ave (nb) Spur a carry?

About 12,240 vehicles per day (2024 count), of which roughly 6% are trucks.

How long is Ramp B S.B. Off over Aramingo Ave (nb) Spur a?

The structure is 782 ft (238.4 m) long with a longest span of 134 ft (40.8 m) and a deck 50 ft wide.

Who owns Ramp B S.B. Off over Aramingo Ave (nb) Spur a?

It is owned by the State Highway Agency.