US Bridges

RTE 907M over Winchester Blvd

Fair

Queens County, New York · JCT Gcp+cross Island Pkwy · Structure no. 000000001076570

Built
1972
53 years old
Condition
Fair
inspected March 2024
Type
Arch - Deck
Concrete
Length
89 ft
1 main span
Daily traffic
19,847
2020 count
Owner
State
State Highway Agency

About this bridge

RTE 907M over Winchester Blvd is a concrete arch - deck carrying RTE 907M over Winchester Blvd in Queens County, New York. It was built in 1972, so it is 53 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 19,847 vehicles a day, roughly 1% of them trucks, projected to reach 24,471 by 2041. The structure is 89 ft (27.1 m) long and 44 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesRTE 907M
CrossesWinchester Blvd
LocationJCT Gcp+cross Island Pkwy
RouteCity Street 907M
Coordinates40.74237, -73.73341
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71.9 US tons
Inventory rating24.8 US tons

Structure

Structure typeArch - Deck
MaterialConcrete
DeckNot applicable
Main spans1
Design loadH 20
Structure length89 ft (27.1 m)
Longest span85 ft (25.9 m)
Deck width44 ft (13.4 m)
Roadway width39 ft (11.9 m)
Vertical clearance over deck107 ft (32.7 m)

Traffic and service

Average daily traffic19,847 (2020)
Projected traffic24,471 by 2041
Trucks1%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$14 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was RTE 907M over Winchester Blvd built?

It was built in 1972, making it 53 years old in 2025.

What condition is RTE 907M over Winchester Blvd in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does RTE 907M over Winchester Blvd carry?

About 19,847 vehicles per day (2020 count), of which roughly 1% are trucks.

How long is RTE 907M over Winchester Blvd?

The structure is 89 ft (27.1 m) long with a longest span of 85 ft (25.9 m) and a deck 44 ft wide.

Who owns RTE 907M over Winchester Blvd?

It is owned by the State Highway Agency.