US Bridges

I-75R NB to Fulton over M-9053 Georgia Ave.

Good

Fulton County, Georgia · In Atlanta · Structure no. 000000012106690

Built
1988
37 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
210 ft
3 main spans
Daily traffic
6,805
2024 count
Owner
State
State Highway Agency

About this bridge

I-75R NB to Fulton over M-9053 Georgia Ave. is a prestressed concrete stringer/multi-beam or girder carrying I-75R NB to Fulton over M-9053 Georgia Ave. in Fulton County, Georgia. It was built in 1988, so it is 37 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,805 vehicles a day, roughly 1% of them trucks, projected to reach 8,880 by 2032. The structure is 210 ft (64 m) long and 33 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesI-75R NB to Fulton
CrossesM-9053 Georgia Ave.
LocationIn Atlanta
RouteInterstate 75
StateGeorgia
Coordinates33.73684, -84.39123
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50.9 US tons
Inventory rating35.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length210 ft (64 m)
Longest span120 ft (36.6 m)
Deck width33 ft (10.1 m)
Roadway width30 ft (9.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,805 (2024)
Projected traffic8,880 by 2032
Trucks1%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$895,000
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-75R NB to Fulton over M-9053 Georgia Ave. built?

It was built in 1988, making it 37 years old in 2025.

What condition is I-75R NB to Fulton over M-9053 Georgia Ave. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does I-75R NB to Fulton over M-9053 Georgia Ave. carry?

About 6,805 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is I-75R NB to Fulton over M-9053 Georgia Ave.?

The structure is 210 ft (64 m) long with a longest span of 120 ft (36.6 m) and a deck 33 ft wide.

Who owns I-75R NB to Fulton over M-9053 Georgia Ave.?

It is owned by the State Highway Agency.