US Bridges

Fulton Street over M-9164 Central Ave.

Good

Fulton County, Georgia · In Atlanta · Structure no. 000000012106600

Built
1988
37 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
77 ft
1 main span
Daily traffic
9,910
2024 count
Owner
State
State Highway Agency

About this bridge

Fulton Street over M-9164 Central Ave. is a prestressed concrete stringer/multi-beam or girder carrying Fulton Street over M-9164 Central Ave. in Fulton County, Georgia. It was built in 1988, so it is 37 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,910 vehicles a day, roughly 1% of them trucks, projected to reach 8,820 by 2032. The structure is 77 ft (23.5 m) long and 88 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesFulton Street
CrossesM-9164 Central Ave.
LocationIn Atlanta
RouteCity Street 9167
StateGeorgia
Coordinates33.74189, -84.39331
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating42 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length77 ft (23.5 m)
Longest span77 ft (23.5 m)
Deck width88 ft (26.9 m)
Roadway width66 ft (20.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,910 (2024)
Projected traffic8,820 by 2032
Trucks1%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$821,000
NavigationNot applicable (no waterway)

Frequently asked questions

When was Fulton Street over M-9164 Central Ave. built?

It was built in 1988, making it 37 years old in 2025.

What condition is Fulton Street over M-9164 Central Ave. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Fulton Street over M-9164 Central Ave. carry?

About 9,910 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Fulton Street over M-9164 Central Ave.?

The structure is 77 ft (23.5 m) long with a longest span of 77 ft (23.5 m) and a deck 88 ft wide.

Who owns Fulton Street over M-9164 Central Ave.?

It is owned by the State Highway Agency.