I-75 over M-9053 Georgia Ave.

Good

Fulton County, Georgia · In Atlanta · Structure no. 000000012106320

Built
1987
38 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
192 ft
3 main spans
Daily traffic
339,000
2024 count
Owner
State
State Highway Agency

About this bridge

I-75 over M-9053 Georgia Ave. is a prestressed concrete stringer/multi-beam or girder carrying I-75 over M-9053 Georgia Ave. in Fulton County, Georgia. It was built in 1987, so it is 38 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 339,000 vehicles a day, roughly 1% of them trucks, projected to reach 390,450 by 2032. The structure is 192 ft (58.5 m) long and 229 ft wide.

CarriesI-75
CrossesM-9053 Georgia Ave.
LocationIn Atlanta
RouteInterstate 75
StateGeorgia
Coordinates33.73688, -84.39203
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50.9 US tons
Inventory rating35.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length192 ft (58.5 m)
Longest span120 ft (36.6 m)
Deck width229 ft (69.9 m)
Roadway width222 ft (67.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic339,000 (2024)
Projected traffic390,450 by 2032
Trucks1%
Lanes on structure14
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$4.8 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-75 over M-9053 Georgia Ave. built?

It was built in 1987, making it 38 years old in 2025.

What condition is I-75 over M-9053 Georgia Ave. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does I-75 over M-9053 Georgia Ave. carry?

About 339,000 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is I-75 over M-9053 Georgia Ave.?

The structure is 192 ft (58.5 m) long with a longest span of 120 ft (36.6 m) and a deck 229 ft wide.

Who owns I-75 over M-9053 Georgia Ave.?

It is owned by the State Highway Agency.