US Bridges

Fulton RM to I-75 over I-75 NB Rmp to I-20 E&wb

Good

Fulton County, Georgia · In Atlanta · Structure no. 000000012107000

Built
1988
37 years old
Condition
Good
inspected July 2023
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete Continuous
Length
85 ft
1 main span
Daily traffic
7,500
2024 count
Owner
State
State Highway Agency

About this bridge

Fulton RM to I-75 over I-75 NB Rmp to I-20 E&wb is a prestressed concrete continuous box beam or girders - single or spread carrying Fulton RM to I-75 over I-75 NB Rmp to I-20 E&wb in Fulton County, Georgia. It was built in 1988, so it is 37 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,500 vehicles a day, roughly 1% of them trucks, projected to reach 6,960 by 2032. The structure is 85 ft (25.9 m) long and 45 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesFulton RM to I-75
CrossesI-75 NB Rmp to I-20 E&wb
LocationIn Atlanta
RouteInterstate 75
StateGeorgia
Coordinates33.74226, -84.39116
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61 US tons
Inventory rating35.9 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length85 ft (25.9 m)
Longest span85 ft (25.9 m)
Deck width45 ft (13.8 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,500 (2024)
Projected traffic6,960 by 2032
Trucks1%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$498,000
NavigationNot applicable (no waterway)

Frequently asked questions

When was Fulton RM to I-75 over I-75 NB Rmp to I-20 E&wb built?

It was built in 1988, making it 37 years old in 2025.

What condition is Fulton RM to I-75 over I-75 NB Rmp to I-20 E&wb in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Fulton RM to I-75 over I-75 NB Rmp to I-20 E&wb carry?

About 7,500 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Fulton RM to I-75 over I-75 NB Rmp to I-20 E&wb?

The structure is 85 ft (25.9 m) long with a longest span of 85 ft (25.9 m) and a deck 45 ft wide.

Who owns Fulton RM to I-75 over I-75 NB Rmp to I-20 E&wb?

It is owned by the State Highway Agency.