US Bridges

I-595 WB to SR-84 over Retention Pond

Good

Broward County, Florida · 0.60 Mi. E of Weston Rd. · Structure no. 860640

Built
2008
17 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
765 ft
18 main spans
Daily traffic
9,100
2023 count
Owner
State
State Highway Agency

About this bridge

I-595 WB to SR-84 over Retention Pond is a prestressed concrete stringer/multi-beam or girder carrying I-595 WB to SR-84 over Retention Pond in Broward County, Florida. It was built in 2008, so it is 17 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,100 vehicles a day, roughly 5% of them trucks, projected to reach 15,788 by 2042. The structure is 765 ft (233.2 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesI-595 WB to SR-84
CrossesRetention Pond
Location0.60 Mi. E of Weston Rd.
RouteInterstate 595
StateFlorida
Coordinates26.12289, -80.34969
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating48.2 US tons
Inventory rating43.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans18
Design loadHL 93
Structure length765 ft (233.2 m)
Longest span43 ft (13 m)
Deck width30 ft (9.2 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,100 (2023)
Projected traffic15,788 by 2042
Trucks5%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I-595 WB to SR-84 over Retention Pond built?

It was built in 2008, making it 17 years old in 2025.

What condition is I-595 WB to SR-84 over Retention Pond in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does I-595 WB to SR-84 over Retention Pond carry?

About 9,100 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is I-595 WB to SR-84 over Retention Pond?

The structure is 765 ft (233.2 m) long with a longest span of 43 ft (13 m) and a deck 30 ft wide.

Who owns I-595 WB to SR-84 over Retention Pond?

It is owned by the State Highway Agency.