US Bridges

SB SR869 to SB I75 over I75 Connectors&eb SR-84

Fair

Broward County, Florida · I-595&I-75 Interchange · Structure no. 860516

Built
1988
37 years old
Condition
Fair
inspected February 2024
Type
Segmental Box Girder
Prestressed Concrete Continuous
Length
1,071 ft
8 main spans
Daily traffic
27,500
2024 count
Owner
State
State Highway Agency

About this bridge

SB SR869 to SB I75 over I75 Connectors&eb SR-84 is a prestressed concrete continuous segmental box girder carrying SB SR869 to SB I75 over I75 Connectors&eb SR-84 in Broward County, Florida. It was built in 1988, so it is 37 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 27,500 vehicles a day, roughly 6% of them trucks, projected to reach 47,712 by 2042. The structure is 1,071 ft (326.4 m) long and 59 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesSB SR869 to SB I75
CrossesI75 Connectors&eb SR-84
LocationI-595&I-75 Interchange
RouteInterstate 75
StateFlorida
Coordinates26.11969, -80.34697
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47.2 US tons
Inventory rating39.2 US tons

Structure

Structure typeSegmental Box Girder
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans8
Design loadHS 20 + Mod
Structure length1,071 ft (326.4 m)
Longest span170 ft (51.8 m)
Deck width59 ft (17.9 m)
Roadway width56 ft (17.1 m)
Vertical clearance over deck17 ft (5.1 m)

Traffic and service

Average daily traffic27,500 (2024)
Projected traffic47,712 by 2042
Trucks6%
Lanes on structure3
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SB SR869 to SB I75 over I75 Connectors&eb SR-84 built?

It was built in 1988, making it 37 years old in 2025.

What condition is SB SR869 to SB I75 over I75 Connectors&eb SR-84 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does SB SR869 to SB I75 over I75 Connectors&eb SR-84 carry?

About 27,500 vehicles per day (2024 count), of which roughly 6% are trucks.

How long is SB SR869 to SB I75 over I75 Connectors&eb SR-84?

The structure is 1,071 ft (326.4 m) long with a longest span of 170 ft (51.8 m) and a deck 59 ft wide.

Who owns SB SR869 to SB I75 over I75 Connectors&eb SR-84?

It is owned by the State Highway Agency.