US Bridges

SR869 SB to I595EB over NW 8th ST (proposed)

Good

Broward County, Florida · 1.1MI South of SR-838 · Structure no. 860520

Built
1988
37 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
187 ft
3 main spans
Daily traffic
12,000
2023 count
Owner
State
State Highway Agency

About this bridge

SR869 SB to I595EB over NW 8th ST (proposed) is a prestressed concrete stringer/multi-beam or girder carrying SR869 SB to I595EB over NW 8th ST (proposed) in Broward County, Florida. It was built in 1988, so it is 37 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 12,000 vehicles a day, roughly 6% of them trucks, projected to reach 20,820 by 2042. The structure is 187 ft (56.9 m) long and 43 ft wide.

CarriesSR869 SB to I595EB
CrossesNW 8th ST (proposed)
Location1.1MI South of SR-838
RouteInterstate 75
StateFlorida
Coordinates26.13131, -80.34419
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57 US tons
Inventory rating50 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length187 ft (56.9 m)
Longest span104 ft (31.7 m)
Deck width43 ft (13 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,000 (2023)
Projected traffic20,820 by 2042
Trucks6%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkSTRAHNET connector

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR869 SB to I595EB over NW 8th ST (proposed) built?

It was built in 1988, making it 37 years old in 2025.

What condition is SR869 SB to I595EB over NW 8th ST (proposed) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does SR869 SB to I595EB over NW 8th ST (proposed) carry?

About 12,000 vehicles per day (2023 count), of which roughly 6% are trucks.

How long is SR869 SB to I595EB over NW 8th ST (proposed)?

The structure is 187 ft (56.9 m) long with a longest span of 104 ft (31.7 m) and a deck 43 ft wide.

Who owns SR869 SB to I595EB over NW 8th ST (proposed)?

It is owned by the State Highway Agency.