US Bridges

Sunrise Way over Baristo Flood Control Ch

Good

Riverside County, California · 0.15 Mi. S/O Ramon Road · Structure no. 56C0213

Built
1951
74 years old, rebuilt 1974
Condition
Good
inspected February 2025
Type
Culvert
Concrete
Length
33 ft
3 main spans
Daily traffic
18,143
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Sunrise Way over Baristo Flood Control Ch is a concrete culvert carrying Sunrise Way over Baristo Flood Control Ch in Riverside County, California. It was built in 1951 and reconstructed in 1974, so it is 74 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 18,143 vehicles a day, roughly 1% of them trucks, projected to reach 24,770 by 2047. The structure is 33 ft (10.1 m) long and 89 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSunrise Way
CrossesBaristo Flood Control Ch
Location0.15 Mi. S/O Ramon Road
RouteCity Street 0
Coordinates33.81367, -116.52805
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection9 ExcellentNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44.6 US tons
Inventory rating26.8 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadUnknown
Structure length33 ft (10.1 m)
Longest span10 ft (2.9 m)
Deck width89 ft (27.2 m)
Roadway width70 ft (21.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,143 (2020)
Projected traffic24,770 by 2047
Trucks1%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Sunrise Way over Baristo Flood Control Ch built?

It was built in 1951, making it 74 years old in 2025. It was reconstructed in 1974.

What condition is Sunrise Way over Baristo Flood Control Ch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.

How much traffic does Sunrise Way over Baristo Flood Control Ch carry?

About 18,143 vehicles per day (2020 count), of which roughly 1% are trucks.

How long is Sunrise Way over Baristo Flood Control Ch?

The structure is 33 ft (10.1 m) long with a longest span of 10 ft (2.9 m) and a deck 89 ft wide.

Who owns Sunrise Way over Baristo Flood Control Ch?

It is owned by the City or Municipal Highway Agency.