US Bridges

Calle Encilia over Baristo Flood Control Ch

Good

Riverside County, California · 0.20 Mi. N/O Ramon Road · Structure no. 56C0270

Built
1966
59 years old
Condition
Good
inspected February 2025
Type
Slab
Concrete Continuous
Length
32 ft
2 main spans
Daily traffic
2,842
2013 count
Owner
City
City or Municipal Highway Agency

About this bridge

Calle Encilia over Baristo Flood Control Ch is a concrete continuous slab carrying Calle Encilia over Baristo Flood Control Ch in Riverside County, California. It was built in 1966, so it is 59 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,842 vehicles a day, roughly 1% of them trucks, projected to reach 3,217 by 2047. The structure is 32 ft (9.8 m) long and 62 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCalle Encilia
CrossesBaristo Flood Control Ch
Location0.20 Mi. N/O Ramon Road
RouteCity Street 0
Coordinates33.81879, -116.54364
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionFebruary 2025
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating62.8 US tons
Inventory rating37.8 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length32 ft (9.8 m)
Longest span15 ft (4.6 m)
Deck width62 ft (18.9 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,842 (2013)
Projected traffic3,217 by 2047
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Calle Encilia over Baristo Flood Control Ch built?

It was built in 1966, making it 59 years old in 2025.

What condition is Calle Encilia over Baristo Flood Control Ch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.

How much traffic does Calle Encilia over Baristo Flood Control Ch carry?

About 2,842 vehicles per day (2013 count), of which roughly 1% are trucks.

How long is Calle Encilia over Baristo Flood Control Ch?

The structure is 32 ft (9.8 m) long with a longest span of 15 ft (4.6 m) and a deck 62 ft wide.

Who owns Calle Encilia over Baristo Flood Control Ch?

It is owned by the City or Municipal Highway Agency.