US Bridges

Avenida Caballeros over Baristo Flood Control Ch

Good

Riverside County, California · 0.13 Mi. N/O Ramon Road · Structure no. 56C0212

Built
1961
64 years old, rebuilt 1984
Condition
Good
inspected February 2025
Type
Slab
Prestressed Concrete Continuous
Length
26 ft
2 main spans
Daily traffic
4,581
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Avenida Caballeros over Baristo Flood Control Ch is a prestressed concrete continuous slab carrying Avenida Caballeros over Baristo Flood Control Ch in Riverside County, California. It was built in 1961 and reconstructed in 1984, so it is 64 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,581 vehicles a day, roughly 1% of them trucks, projected to reach 5,363 by 2045. The structure is 26 ft (7.9 m) long and 70 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesAvenida Caballeros
CrossesBaristo Flood Control Ch
Location0.13 Mi. N/O Ramon Road
RouteCity Street 0
Coordinates33.8177, -116.53681
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44.6 US tons
Inventory rating26.8 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length26 ft (7.9 m)
Longest span13 ft (4 m)
Deck width70 ft (21.3 m)
Roadway width61 ft (18.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,581 (2021)
Projected traffic5,363 by 2045
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Avenida Caballeros over Baristo Flood Control Ch built?

It was built in 1961, making it 64 years old in 2025. It was reconstructed in 1984.

What condition is Avenida Caballeros over Baristo Flood Control Ch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.

How much traffic does Avenida Caballeros over Baristo Flood Control Ch carry?

About 4,581 vehicles per day (2021 count), of which roughly 1% are trucks.

How long is Avenida Caballeros over Baristo Flood Control Ch?

The structure is 26 ft (7.9 m) long with a longest span of 13 ft (4 m) and a deck 70 ft wide.

Who owns Avenida Caballeros over Baristo Flood Control Ch?

It is owned by the City or Municipal Highway Agency.