US Bridges

Sunrise Way over Tahquitz Creek

Fair

Riverside County, California · 0.4 Mi. S/O Ramon Road · Structure no. 56C0351

Built
1985
40 years old
Condition
Fair
inspected February 2025
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
154 ft
3 main spans
Daily traffic
18,143
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Sunrise Way over Tahquitz Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying Sunrise Way over Tahquitz Creek in Riverside County, California. It was built in 1985, so it is 40 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 18,143 vehicles a day, roughly 1% of them trucks, projected to reach 23,951 by 2047. The structure is 154 ft (46.9 m) long and 78 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSunrise Way
CrossesTahquitz Creek
Location0.4 Mi. S/O Ramon Road
RouteCity Street 0
Coordinates33.81023, -116.52808
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71.8 US tons
Inventory rating55.3 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length154 ft (46.9 m)
Longest span57 ft (17.4 m)
Deck width78 ft (23.8 m)
Roadway width63 ft (19.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,143 (2020)
Projected traffic23,951 by 2047
Trucks1%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Sunrise Way over Tahquitz Creek built?

It was built in 1985, making it 40 years old in 2025.

What condition is Sunrise Way over Tahquitz Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.

How much traffic does Sunrise Way over Tahquitz Creek carry?

About 18,143 vehicles per day (2020 count), of which roughly 1% are trucks.

How long is Sunrise Way over Tahquitz Creek?

The structure is 154 ft (46.9 m) long with a longest span of 57 ft (17.4 m) and a deck 78 ft wide.

Who owns Sunrise Way over Tahquitz Creek?

It is owned by the City or Municipal Highway Agency.