US Bridges

Calle El Segundo over Baristo Flood Control Ch

Good

Riverside County, California · 0.16 Mi. N/O Ramon Road · Structure no. 56C0271

Built
1966
59 years old, rebuilt 1970
Condition
Good
inspected February 2023
Type
Slab
Concrete Continuous
Length
28 ft
2 main spans
Daily traffic
2,843
2013 count
Owner
City
City or Municipal Highway Agency

About this bridge

Calle El Segundo over Baristo Flood Control Ch is a concrete continuous slab carrying Calle El Segundo over Baristo Flood Control Ch in Riverside County, California. It was built in 1966 and reconstructed in 1970, so it is 59 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,843 vehicles a day, roughly 1% of them trucks, projected to reach 4,333 by 2045. The structure is 28 ft (8.5 m) long and 62 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCalle El Segundo
CrossesBaristo Flood Control Ch
Location0.16 Mi. N/O Ramon Road
RouteCity Street 0
Coordinates33.81834, -116.54174
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionFebruary 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71.1 US tons
Inventory rating42.9 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length28 ft (8.5 m)
Longest span13 ft (4 m)
Deck width62 ft (18.9 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,843 (2013)
Projected traffic4,333 by 2045
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Calle El Segundo over Baristo Flood Control Ch built?

It was built in 1966, making it 59 years old in 2025. It was reconstructed in 1970.

What condition is Calle El Segundo over Baristo Flood Control Ch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does Calle El Segundo over Baristo Flood Control Ch carry?

About 2,843 vehicles per day (2013 count), of which roughly 1% are trucks.

How long is Calle El Segundo over Baristo Flood Control Ch?

The structure is 28 ft (8.5 m) long with a longest span of 13 ft (4 m) and a deck 62 ft wide.

Who owns Calle El Segundo over Baristo Flood Control Ch?

It is owned by the City or Municipal Highway Agency.