IRR BIA RTE 117 over Second Feeder Drain
FairLa Paz County, Arizona · 0.5 KM South of BIA 38 · Structure no. 00000000000H040
- Built
- 1955
- 70 years old
- Condition
- Fair
- inspected February 2024
- Type
- Slab
- Concrete
- Length
- 60 ft
- 3 main spans
- Daily traffic
- 112
- 2024 count
- Owner
- Federal
- Bureau of Indian Affairs
About this bridge
IRR BIA RTE 117 over Second Feeder Drain is a concrete slab carrying IRR BIA RTE 117 over Second Feeder Drain in La Paz County, Arizona. It was built in 1955, so it is 70 years old, older than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 112 vehicles a day, roughly 15% of them trucks, projected to reach 131 by 2044. The structure is 60 ft (18.2 m) long and 22 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IRR BIA RTE 117 over Second Feeder Drain built?
It was built in 1955, making it 70 years old in 2025.
What condition is IRR BIA RTE 117 over Second Feeder Drain in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does IRR BIA RTE 117 over Second Feeder Drain carry?
About 112 vehicles per day (2024 count), of which roughly 15% are trucks.
How long is IRR BIA RTE 117 over Second Feeder Drain?
The structure is 60 ft (18.2 m) long with a longest span of 20 ft (6.1 m) and a deck 22 ft wide.
Who owns IRR BIA RTE 117 over Second Feeder Drain?
It is owned by the Bureau of Indian Affairs.