Maintenance Road over West Canal W39.9
FairPosted for loadGrant County, Washington · West Canal W39.9 Station · Structure no. 11WC0252
- Built
- 1950
- 75 years old, rebuilt 2003
- Condition
- Fair
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 47 ft
- 1 main span
- Daily traffic
- 20
- 2022 count
- Owner
- Federal
- Bureau of Reclamation
About this bridge
Maintenance Road over West Canal W39.9 is a steel stringer/multi-beam or girder carrying Maintenance Road over West Canal W39.9 in Grant County, Washington. It was built in 1950 and reconstructed in 2003, so it is 75 years old, older than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 20 vehicles a day, projected to reach 20 by 2042. The structure is 47 ft (14.3 m) long and 19 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Maintenance Road over West Canal W39.9 built?
It was built in 1950, making it 75 years old in 2025. It was reconstructed in 2003.
What condition is Maintenance Road over West Canal W39.9 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does Maintenance Road over West Canal W39.9 carry?
About 20 vehicles per day (2022 count).
How long is Maintenance Road over West Canal W39.9?
The structure is 47 ft (14.3 m) long with a longest span of 39 ft (11.9 m) and a deck 19 ft wide.
Who owns Maintenance Road over West Canal W39.9?
It is owned by the Bureau of Reclamation and maintained by the Private (other than railroad).