3 RD NW over Irrigation Lateral
FairPosted for loadGrant County, Washington · 3 NW 0.5 East of P NW · Structure no. 082037000000000
- Built
- 1952
- 73 years old
- Condition
- Fair
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 31 ft
- 1 main span
- Daily traffic
- 121
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
3 RD NW over Irrigation Lateral is a wood or timber stringer/multi-beam or girder carrying 3 RD NW over Irrigation Lateral in Grant County, Washington. It was built in 1952, so it is 73 years old, older than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 121 vehicles a day, roughly 39% of them trucks, projected to reach 250 by 2043. The structure is 31 ft (9.4 m) long and 25 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 3 RD NW over Irrigation Lateral built?
It was built in 1952, making it 73 years old in 2025.
What condition is 3 RD NW over Irrigation Lateral in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does 3 RD NW over Irrigation Lateral carry?
About 121 vehicles per day (2022 count), of which roughly 39% are trucks.
How long is 3 RD NW over Irrigation Lateral?
The structure is 31 ft (9.4 m) long with a longest span of 30 ft (9.1 m) and a deck 25 ft wide.
Who owns 3 RD NW over Irrigation Lateral?
It is owned by the County Highway Agency.