US Bridges

3 RD NW over Irrigation Lateral

FairPosted for load

Grant County, Washington · 3 NW 0.5 East of P NW · Structure no. 082037000000000

Built
1952
73 years old
Condition
Fair
inspected December 2024
Type
Stringer/Multi-beam or Girder
Wood or Timber
Length
31 ft
1 main span
Daily traffic
121
2022 count
Owner
County
County Highway Agency

About this bridge

3 RD NW over Irrigation Lateral is a wood or timber stringer/multi-beam or girder carrying 3 RD NW over Irrigation Lateral in Grant County, Washington. It was built in 1952, so it is 73 years old, older than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 121 vehicles a day, roughly 39% of them trucks, projected to reach 250 by 2043. The structure is 31 ft (9.4 m) long and 25 ft wide. If it were closed, the detour would be 5 mi (8 km).

Carries3 RD NW
CrossesIrrigation Lateral
Location3 NW 0.5 East of P NW
RouteCounty Highway 36200
Coordinates47.13228, -119.82197
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating40 US tons
Inventory rating27 US tons

Structure

MaterialWood or Timber
DeckWood or timber
Main spans1
Design loadH 15
Structure length31 ft (9.4 m)
Longest span30 ft (9.1 m)
Deck width25 ft (7.6 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic121 (2022)
Projected traffic250 by 2043
Trucks39%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1.5 million (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was 3 RD NW over Irrigation Lateral built?

It was built in 1952, making it 73 years old in 2025.

What condition is 3 RD NW over Irrigation Lateral in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.

How much traffic does 3 RD NW over Irrigation Lateral carry?

About 121 vehicles per day (2022 count), of which roughly 39% are trucks.

How long is 3 RD NW over Irrigation Lateral?

The structure is 31 ft (9.4 m) long with a longest span of 30 ft (9.1 m) and a deck 25 ft wide.

Who owns 3 RD NW over Irrigation Lateral?

It is owned by the County Highway Agency.