US Bridges

Maintenance Road over West Canal W39.9

FairPosted for load

Grant County, Washington · West Canal W39.9 Station · Structure no. 11WC0251

Built
2016
9 years old
Condition
Fair
inspected November 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
39 ft
1 main span
Daily traffic
10
2022 count
Owner
Federal
Bureau of Reclamation

About this bridge

Maintenance Road over West Canal W39.9 is a steel stringer/multi-beam or girder carrying Maintenance Road over West Canal W39.9 in Grant County, Washington. It was built in 2016, so it is 9 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 10 vehicles a day, projected to reach 10 by 2042. The structure is 39 ft (11.9 m) long and 14 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesMaintenance Road
CrossesWest Canal W39.9
LocationWest Canal W39.9 Station
Coordinates47.14957, -119.85308
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating23.6 US tons
Inventory rating18.2 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length39 ft (11.9 m)
Longest span31 ft (9.4 m)
Deck width14 ft (4.3 m)
Roadway width14 ft (4.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10 (2022)
Projected traffic10 by 2042
Trucks0%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerBureau of Reclamation
Maintained byPrivate (other than railroad)
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Maintenance Road over West Canal W39.9 built?

It was built in 2016, making it 9 years old in 2025.

What condition is Maintenance Road over West Canal W39.9 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does Maintenance Road over West Canal W39.9 carry?

About 10 vehicles per day (2022 count).

How long is Maintenance Road over West Canal W39.9?

The structure is 39 ft (11.9 m) long with a longest span of 31 ft (9.4 m) and a deck 14 ft wide.

Who owns Maintenance Road over West Canal W39.9?

It is owned by the Bureau of Reclamation and maintained by the Private (other than railroad).