US Bridges

SR-225 Park Lane over US-89 (SR-89)

Good

Davis County, Utah · Lagoon Interchange · Structure no. 0F 716

Built
2004
21 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
166 ft
1 main span
Daily traffic
19,571
2017 count
Owner
State
State Highway Agency

About this bridge

SR-225 Park Lane over US-89 (SR-89) is a prestressed concrete stringer/multi-beam or girder carrying SR-225 Park Lane over US-89 (SR-89) in Davis County, Utah. It was built in 2004, so it is 21 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 19,571 vehicles a day, roughly 16% of them trucks, projected to reach 23,485 by 2037. The structure is 166 ft (50.5 m) long and 86 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesSR-225 Park Lane
CrossesUS-89 (SR-89)
LocationLagoon Interchange
RouteState Highway 225
StateUtah
Coordinates40.99111, -111.90306
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating82.1 US tons
Inventory rating40 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length166 ft (50.5 m)
Longest span160 ft (48.7 m)
Deck width86 ft (26.3 m)
Roadway width84 ft (25.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic19,571 (2017)
Projected traffic23,485 by 2037
Trucks16%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR-225 Park Lane over US-89 (SR-89) built?

It was built in 2004, making it 21 years old in 2025.

What condition is SR-225 Park Lane over US-89 (SR-89) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does SR-225 Park Lane over US-89 (SR-89) carry?

About 19,571 vehicles per day (2017 count), of which roughly 16% are trucks.

How long is SR-225 Park Lane over US-89 (SR-89)?

The structure is 166 ft (50.5 m) long with a longest span of 160 ft (48.7 m) and a deck 86 ft wide.

Who owns SR-225 Park Lane over US-89 (SR-89)?

It is owned by the State Highway Agency.