US Bridges

IH35SB Exp to 820W over IH 35W SB Gp

Good

Tarrant County, Texas · 1.3 MI S of Western Ctr · Structure no. 022200001416634

Built
2021
4 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
871 ft
2 main spans
Daily traffic
10,000
2019 count
Owner
Toll Authority
Local Toll Authority

About this bridge

IH35SB Exp to 820W over IH 35W SB Gp is a prestressed concrete stringer/multi-beam or girder carrying IH35SB Exp to 820W over IH 35W SB Gp in Tarrant County, Texas. It was built in 2021, so it is 4 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,000 vehicles a day, roughly 10% of them trucks, projected to reach 21,000 by 2039. The structure is 871 ft (265.5 m) long and 28 ft wide.

CarriesIH35SB Exp to 820W
CrossesIH 35W SB Gp
Location1.3 MI S of Western Ctr
StateTexas
Coordinates32.84155, -97.31351
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2 (+6 approach)
Design loadHL 93
Structure length871 ft (265.5 m)
Longest span143 ft (43.6 m)
Deck width28 ft (8.5 m)
Roadway width25 ft (7.7 m)
Vertical clearance over deck17 ft (5.1 m)

Traffic and service

Average daily traffic10,000 (2019)
Projected traffic21,000 by 2039
Trucks10%
Lanes on structure1
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH35SB Exp to 820W over IH 35W SB Gp built?

It was built in 2021, making it 4 years old in 2025.

What condition is IH35SB Exp to 820W over IH 35W SB Gp in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does IH35SB Exp to 820W over IH 35W SB Gp carry?

About 10,000 vehicles per day (2019 count), of which roughly 10% are trucks.

How long is IH35SB Exp to 820W over IH 35W SB Gp?

The structure is 871 ft (265.5 m) long with a longest span of 143 ft (43.6 m) and a deck 28 ft wide.

Who owns IH35SB Exp to 820W over IH 35W SB Gp?

It is owned by the Local Toll Authority.