Exp IH35SB-820EB over IH 820 & IH 35W Express
GoodTarrant County, Texas · IH-35 @ IH-820 · Structure no. 022200001416532
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 3,213 ft
- 32 main spans
- Daily traffic
- 9,900
- 2010 count
- Owner
- State
- State Highway Agency
About this bridge
Exp IH35SB-820EB over IH 820 & IH 35W Express is a prestressed concrete stringer/multi-beam or girder carrying Exp IH35SB-820EB over IH 820 & IH 35W Express in Tarrant County, Texas. It was built in 2013, so it is 12 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 9,900 vehicles a day, roughly 10% of them trucks, projected to reach 15,200 by 2033. The structure is 3,213 ft (979.3 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Exp IH35SB-820EB over IH 820 & IH 35W Express built?
It was built in 2013, making it 12 years old in 2025.
What condition is Exp IH35SB-820EB over IH 820 & IH 35W Express in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does Exp IH35SB-820EB over IH 820 & IH 35W Express carry?
About 9,900 vehicles per day (2010 count), of which roughly 10% are trucks.
How long is Exp IH35SB-820EB over IH 820 & IH 35W Express?
The structure is 3,213 ft (979.3 m) long with a longest span of 121 ft (36.9 m) and a deck 28 ft wide.
Who owns Exp IH35SB-820EB over IH 820 & IH 35W Express?
It is owned by the State Highway Agency and maintained by the Local Toll Authority.