US Bridges

Caballero Ct Pct 3 over Trib Hart Branch

Good

Parker County, Texas · 0.2 MI W of Tin Top RD · Structure no. 021840AA0945001

Built
2021
4 years old
Condition
Good
inspected December 2023
Type
Culvert
Steel
Length
93 ft
13 main spans
Daily traffic
100
2021 count
Owner
County
County Highway Agency

About this bridge

Caballero Ct Pct 3 over Trib Hart Branch is a steel culvert carrying Caballero Ct Pct 3 over Trib Hart Branch in Parker County, Texas. It was built in 2021, so it is 4 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, projected to reach 200 by 2040. The structure is 93 ft (28.3 m) long. If it were closed, the detour would be 98.8 mi (159 km).

CarriesCaballero Ct Pct 3
CrossesTrib Hart Branch
Location0.2 MI W of Tin Top RD
RouteCounty Highway 0
StateTexas
Coordinates32.65326, -97.80007
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating45 US tons

Structure

Structure typeCulvert
MaterialSteel
DeckNot applicable
Main spans13
Design loadUnknown
Structure length93 ft (28.3 m)
Longest span5 ft (1.5 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2021)
Projected traffic200 by 2040
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Caballero Ct Pct 3 over Trib Hart Branch built?

It was built in 2021, making it 4 years old in 2025.

What condition is Caballero Ct Pct 3 over Trib Hart Branch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Caballero Ct Pct 3 over Trib Hart Branch carry?

About 100 vehicles per day (2021 count).

How long is Caballero Ct Pct 3 over Trib Hart Branch?

The structure is 93 ft (28.3 m) long with a longest span of 5 ft (1.5 m).

Who owns Caballero Ct Pct 3 over Trib Hart Branch?

It is owned by the County Highway Agency.