Thompson Pct 3 over East Sanchez Creek
GoodParker County, Texas · 0.5 MI E of FM 1884 · Structure no. 021840AA0438001
- Built
- 2002
- 23 years old
- Condition
- Good
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 145 ft
- 1 main span
- Daily traffic
- 1,701
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Thompson Pct 3 over East Sanchez Creek is a prestressed concrete stringer/multi-beam or girder carrying Thompson Pct 3 over East Sanchez Creek in Parker County, Texas. It was built in 2002, so it is 23 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,701 vehicles a day, projected to reach 1,130 by 2029. The structure is 145 ft (44.2 m) long and 32 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Thompson Pct 3 over East Sanchez Creek built?
It was built in 2002, making it 23 years old in 2025.
What condition is Thompson Pct 3 over East Sanchez Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does Thompson Pct 3 over East Sanchez Creek carry?
About 1,701 vehicles per day (2024 count).
How long is Thompson Pct 3 over East Sanchez Creek?
The structure is 145 ft (44.2 m) long with a longest span of 65 ft (19.8 m) and a deck 32 ft wide.
Who owns Thompson Pct 3 over East Sanchez Creek?
It is owned by the County Highway Agency.