Tin Top RD Pct 3 over Hart Branch
FairParker County, Texas · 0.65 Mi. N. of FM 1708 · Structure no. 021840AA0124001
- Built
- 1945
- 80 years old, rebuilt 1987
- Condition
- Fair
- inspected December 2023
- Type
- Slab
- Concrete Continuous
- Length
- 36 ft
- 2 main spans
- Daily traffic
- 2,585
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Tin Top RD Pct 3 over Hart Branch is a concrete continuous slab carrying Tin Top RD Pct 3 over Hart Branch in Parker County, Texas. It was built in 1945 and reconstructed in 1987, so it is 80 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,585 vehicles a day, projected to reach 2,220 by 2029. The structure is 36 ft (11 m) long and 25 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Tin Top RD Pct 3 over Hart Branch built?
It was built in 1945, making it 80 years old in 2025. It was reconstructed in 1987.
What condition is Tin Top RD Pct 3 over Hart Branch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does Tin Top RD Pct 3 over Hart Branch carry?
About 2,585 vehicles per day (2024 count).
How long is Tin Top RD Pct 3 over Hart Branch?
The structure is 36 ft (11 m) long with a longest span of 17 ft (5.2 m) and a deck 25 ft wide.
Who owns Tin Top RD Pct 3 over Hart Branch?
It is owned by the County Highway Agency.