US Bridges

Shanes Lane Pct 3 over Falley Branch

Good

Parker County, Texas · 75 W of Tin Top RD · Structure no. 021840AA0383001

Built
2004
21 years old
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
40 ft
1 main span
Daily traffic
50
2010 count
Owner
County
County Highway Agency

About this bridge

Shanes Lane Pct 3 over Falley Branch is a steel stringer/multi-beam or girder carrying Shanes Lane Pct 3 over Falley Branch in Parker County, Texas. It was built in 2004, so it is 21 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 100 by 2029. The structure is 40 ft (12.2 m) long and 24 ft wide.

CarriesShanes Lane Pct 3
CrossesFalley Branch
Location75 W of Tin Top RD
RouteCounty Highway 0
StateTexas
Coordinates32.68478, -97.78898
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51 US tons
Inventory rating38 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length40 ft (12.2 m)
Longest span39 ft (11.9 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2010)
Projected traffic100 by 2029
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Shanes Lane Pct 3 over Falley Branch built?

It was built in 2004, making it 21 years old in 2025.

What condition is Shanes Lane Pct 3 over Falley Branch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Shanes Lane Pct 3 over Falley Branch carry?

About 50 vehicles per day (2010 count).

How long is Shanes Lane Pct 3 over Falley Branch?

The structure is 40 ft (12.2 m) long with a longest span of 39 ft (11.9 m) and a deck 24 ft wide.

Who owns Shanes Lane Pct 3 over Falley Branch?

It is owned by the County Highway Agency.