Pr 378 5.1 KM over Guayanilla River
FairGuayanilla Municipio, Puerto Rico · 4.5 Miles N of Guayanilla · Structure no. 006851
- Built
- 1954
- 71 years old
- Condition
- Fair
- inspected August 2024
- Type
- Slab
- Concrete Continuous
- Length
- 77 ft
- 3 main spans
- Daily traffic
- 400
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 378 5.1 KM over Guayanilla River is a concrete continuous slab carrying Pr 378 5.1 KM over Guayanilla River in Guayanilla Municipio, Puerto Rico. It was built in 1954, so it is 71 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 400 vehicles a day, roughly 5% of them trucks, projected to reach 500 by 2025. The structure is 77 ft (23.5 m) long and 25 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 378 5.1 KM over Guayanilla River built?
It was built in 1954, making it 71 years old in 2025.
What condition is Pr 378 5.1 KM over Guayanilla River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does Pr 378 5.1 KM over Guayanilla River carry?
About 400 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 378 5.1 KM over Guayanilla River?
The structure is 77 ft (23.5 m) long with a longest span of 31 ft (9.5 m) and a deck 25 ft wide.
Who owns Pr 378 5.1 KM over Guayanilla River?
It is owned by the State Highway Agency.