US Bridges

Off Pr 375 at 0.85 over Grande Creek

FairPosted for load

Guayanilla Municipio, Puerto Rico · 4 Miles N of Guayanilla · Structure no. 013871

Built
1960
65 years old
Condition
Fair
inspected July 2023
Type
Culvert
Concrete
Length
27 ft
2 main spans
Daily traffic
100
2005 count
Owner
City
City or Municipal Highway Agency

About this bridge

Off Pr 375 at 0.85 over Grande Creek is a concrete culvert carrying Off Pr 375 at 0.85 over Grande Creek in Guayanilla Municipio, Puerto Rico. It was built in 1960, so it is 65 years old, older than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 100 vehicles a day, roughly 2% of them trucks, projected to reach 200 by 2025. The structure is 27 ft (8.3 m) long. If it were closed, the detour would be 123.7 mi (199 km).

CarriesOff Pr 375 at 0.85
CrossesGrande Creek
Location4 Miles N of Guayanilla
RouteCounty Highway 0
Coordinates18.07359, -66.80139
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating22.7 US tons
Inventory rating17.6 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadUnknown
Structure length27 ft (8.3 m)
Longest span14 ft (4.2 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2005)
Projected traffic200 by 2025
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$351,000 (2017 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Off Pr 375 at 0.85 over Grande Creek built?

It was built in 1960, making it 65 years old in 2025.

What condition is Off Pr 375 at 0.85 over Grande Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.

How much traffic does Off Pr 375 at 0.85 over Grande Creek carry?

About 100 vehicles per day (2005 count), of which roughly 2% are trucks.

How long is Off Pr 375 at 0.85 over Grande Creek?

The structure is 27 ft (8.3 m) long with a longest span of 14 ft (4.2 m).

Who owns Off Pr 375 at 0.85 over Grande Creek?

It is owned by the City or Municipal Highway Agency.