US Bridges

Off Pr 375 KM 2.1 over Grande Creek

Poor

Guayanilla Municipio, Puerto Rico · 4 Miles N of Guayanilla · Structure no. 010421

Built
1965
60 years old
Condition
Poor
inspected August 2024
Type
Culvert
Concrete
Length
22 ft
2 main spans
Daily traffic
1,000
2017 count
Owner
City
City or Municipal Highway Agency

About this bridge

Off Pr 375 KM 2.1 over Grande Creek is a concrete culvert carrying Off Pr 375 KM 2.1 over Grande Creek in Guayanilla Municipio, Puerto Rico. It was built in 1965, so it is 60 years old, older than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: open, posting recommended but not legally implemented.

It carries about 1,000 vehicles a day, roughly 2% of them trucks, projected to reach 1,300 by 2025. The structure is 22 ft (6.7 m) long. If it were closed, the detour would be 123.7 mi (199 km).

CarriesOff Pr 375 KM 2.1
CrossesGrande Creek
Location4 Miles N of Guayanilla
RouteCounty Highway 0
Coordinates18.08084, -66.8084
Functional classRural Local

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert4 PoorAdvanced section loss, deterioration, spalling or scour.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, posting recommended but not legally implemented
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating17.6 US tons
Inventory rating13.3 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadUnknown
Structure length22 ft (6.7 m)
Longest span11 ft (3.3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2017)
Projected traffic1,300 by 2025
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$14,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Off Pr 375 KM 2.1 over Grande Creek built?

It was built in 1965, making it 60 years old in 2025.

What condition is Off Pr 375 KM 2.1 over Grande Creek in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in August 2024.

How much traffic does Off Pr 375 KM 2.1 over Grande Creek carry?

About 1,000 vehicles per day (2017 count), of which roughly 2% are trucks.

How long is Off Pr 375 KM 2.1 over Grande Creek?

The structure is 22 ft (6.7 m) long with a longest span of 11 ft (3.3 m).

Who owns Off Pr 375 KM 2.1 over Grande Creek?

It is owned by the City or Municipal Highway Agency.