US Bridges

Off Pr 375 1.1 KM over Grande Creek

Fair

Guayanilla Municipio, Puerto Rico · 5 KM at N. of Guayanilla · Structure no. 025841

Built
1994
31 years old
Condition
Fair
inspected August 2024
Type
Culvert
Concrete
Length
29 ft
2 main spans
Daily traffic
1,000
2017 count
Owner
City
City or Municipal Highway Agency

About this bridge

Off Pr 375 1.1 KM over Grande Creek is a concrete culvert carrying Off Pr 375 1.1 KM over Grande Creek in Guayanilla Municipio, Puerto Rico. It was built in 1994, so it is 31 years old, younger than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,000 vehicles a day, roughly 2% of them trucks, projected to reach 1,300 by 2025. The structure is 29 ft (8.8 m) long and 20 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesOff Pr 375 1.1 KM
CrossesGrande Creek
Location5 KM at N. of Guayanilla
RouteCounty Highway 0
Coordinates18.07484, -66.80369
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating46.7 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length29 ft (8.8 m)
Longest span13 ft (4.1 m)
Deck width20 ft (6 m)
Roadway width18 ft (5.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2017)
Projected traffic1,300 by 2025
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$44,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Off Pr 375 1.1 KM over Grande Creek built?

It was built in 1994, making it 31 years old in 2025.

What condition is Off Pr 375 1.1 KM over Grande Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does Off Pr 375 1.1 KM over Grande Creek carry?

About 1,000 vehicles per day (2017 count), of which roughly 2% are trucks.

How long is Off Pr 375 1.1 KM over Grande Creek?

The structure is 29 ft (8.8 m) long with a longest span of 13 ft (4.1 m) and a deck 20 ft wide.

Who owns Off Pr 375 1.1 KM over Grande Creek?

It is owned by the City or Municipal Highway Agency.