US Bridges

S.R. 0220 over SR 220

Good

Lycoming County, Pennsylvania · Village of Linden · Structure no. 000000000070380

Built
2024
1 years old
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Concrete
Length
119 ft
1 main span
Daily traffic
19,230
2024 count
Owner
State
State Highway Agency

About this bridge

S.R. 0220 over SR 220 is a concrete stringer/multi-beam or girder carrying S.R. 0220 over SR 220 in Lycoming County, Pennsylvania. It was built in 2024, so it is 1 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 19,230 vehicles a day, roughly 12% of them trucks, projected to reach 23,727 by 2044. The structure is 119 ft (36.3 m) long and 97 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesS.R. 0220
CrossesSR 220
LocationVillage of Linden
RouteU.S. Route 220
Coordinates41.23212, -77.13401
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection4 PoorAdvanced section loss, deterioration, spalling or scour.
Last inspectionMarch 2024
Inspection intervalevery 10 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating69.7 US tons
Inventory rating53.9 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length119 ft (36.3 m)
Longest span116 ft (35.4 m)
Deck width97 ft (29.5 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic19,230 (2024)
Projected traffic23,727 by 2044
Trucks12%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was S.R. 0220 over SR 220 built?

It was built in 2024, making it 1 years old in 2025.

What condition is S.R. 0220 over SR 220 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does S.R. 0220 over SR 220 carry?

About 19,230 vehicles per day (2024 count), of which roughly 12% are trucks.

How long is S.R. 0220 over SR 220?

The structure is 119 ft (36.3 m) long with a longest span of 116 ft (35.4 m) and a deck 97 ft wide.

Who owns S.R. 0220 over SR 220?

It is owned by the State Highway Agency.