SR0220(LR1073WBL) over Over Ramp A-1
GoodLycoming County, Pennsylvania · 3 MI West Newberry · Structure no. 000000000068783
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 82 ft
- 1 main span
- Daily traffic
- 8,963
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR0220(LR1073WBL) over Over Ramp A-1 is a prestressed concrete stringer/multi-beam or girder carrying SR0220(LR1073WBL) over Over Ramp A-1 in Lycoming County, Pennsylvania. It was built in 2022, so it is 3 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 8,963 vehicles a day, roughly 14% of them trucks, projected to reach 17,033 by 2032. The structure is 82 ft (25 m) long and 45 ft wide. If it were closed, the detour would be 14.3 mi (23 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR0220(LR1073WBL) over Over Ramp A-1 built?
It was built in 2022, making it 3 years old in 2025.
What condition is SR0220(LR1073WBL) over Over Ramp A-1 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does SR0220(LR1073WBL) over Over Ramp A-1 carry?
About 8,963 vehicles per day (2023 count), of which roughly 14% are trucks.
How long is SR0220(LR1073WBL) over Over Ramp A-1?
The structure is 82 ft (25 m) long with a longest span of 78 ft (23.8 m) and a deck 45 ft wide.
Who owns SR0220(LR1073WBL) over Over Ramp A-1?
It is owned by the State Highway Agency.