New Alignment over Quenshukeny Run
GoodLycoming County, Pennsylvania · New Alignment - Quenshuke · Structure no. 000000000056633
- Built
- 2019
- 6 years old
- Condition
- Good
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 120 ft
- 1 main span
- Daily traffic
- 300
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
New Alignment over Quenshukeny Run is a prestressed concrete stringer/multi-beam or girder carrying New Alignment over Quenshukeny Run in Lycoming County, Pennsylvania. It was built in 2019, so it is 6 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 300 vehicles a day, roughly 10% of them trucks, projected to reach 256 by 2042. The structure is 120 ft (36.6 m) long and 31 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was New Alignment over Quenshukeny Run built?
It was built in 2019, making it 6 years old in 2025.
What condition is New Alignment over Quenshukeny Run in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does New Alignment over Quenshukeny Run carry?
About 300 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is New Alignment over Quenshukeny Run?
The structure is 120 ft (36.6 m) long with a longest span of 116 ft (35.4 m) and a deck 31 ft wide.
Who owns New Alignment over Quenshukeny Run?
It is owned by the State Highway Agency.