US Bridges

Brighton RD over SR 0376 EB WB

Good

Beaver County, Pennsylvania · Brighton Twp over 376 · Structure no. 000000000046284

Built
2010
15 years old
Condition
Good
inspected September 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
225 ft
4 main spans
Daily traffic
3,120
2024 count
Owner
State
State Highway Agency

About this bridge

Brighton RD over SR 0376 EB WB is a prestressed concrete continuous box beam or girders - multiple carrying Brighton RD over SR 0376 EB WB in Beaver County, Pennsylvania. It was built in 2010, so it is 15 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,120 vehicles a day, roughly 6% of them trucks, projected to reach 4,222 by 2032. The structure is 225 ft (68.6 m) long and 76 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesBrighton RD
CrossesSR 0376 EB WB
LocationBrighton Twp over 376
RouteState Highway 0
Coordinates40.70118, -80.36499
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionSeptember 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64 US tons
Inventory rating48 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length225 ft (68.6 m)
Longest span68 ft (20.7 m)
Deck width76 ft (23.2 m)
Roadway width72 ft (22 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,120 (2024)
Projected traffic4,222 by 2032
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Brighton RD over SR 0376 EB WB built?

It was built in 2010, making it 15 years old in 2025.

What condition is Brighton RD over SR 0376 EB WB in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Brighton RD over SR 0376 EB WB carry?

About 3,120 vehicles per day (2024 count), of which roughly 6% are trucks.

How long is Brighton RD over SR 0376 EB WB?

The structure is 225 ft (68.6 m) long with a longest span of 68 ft (20.7 m) and a deck 76 ft wide.

Who owns Brighton RD over SR 0376 EB WB?

It is owned by the State Highway Agency.