Park Access Road over Two Mile Run
FairPosted for loadBeaver County, Pennsylvania · Inside Two Mile Run Pk · Structure no. 000000000045380
- Built
- 1976
- 49 years old
- Condition
- Fair
- inspected December 2023
- Type
- Girder and Floorbeam System
- Steel
- Length
- 30 ft
- 1 main span
- Daily traffic
- 10
- 2019 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Park Access Road over Two Mile Run is a steel girder and floorbeam system carrying Park Access Road over Two Mile Run in Beaver County, Pennsylvania. It was built in 1976, so it is 49 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 10 vehicles a day, roughly 1% of them trucks, projected to reach 15 by 2041. The structure is 30 ft (9.1 m) long and 11 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Park Access Road over Two Mile Run built?
It was built in 1976, making it 49 years old in 2025.
What condition is Park Access Road over Two Mile Run in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does Park Access Road over Two Mile Run carry?
About 10 vehicles per day (2019 count), of which roughly 1% are trucks.
How long is Park Access Road over Two Mile Run?
The structure is 30 ft (9.1 m) long with a longest span of 28 ft (8.5 m) and a deck 11 ft wide.
Who owns Park Access Road over Two Mile Run?
It is owned by the Town or Township Highway Agency.