SR 0376 EB over T.R. 535 Chapel RD
GoodBeaver County, Pennsylvania · I-376 SB over T.R. 535 · Structure no. 000000000003532
- Built
- 1973
- 52 years old, rebuilt 2011
- Condition
- Good
- inspected April 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 113 ft
- 3 main spans
- Daily traffic
- 11,363
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 0376 EB over T.R. 535 Chapel RD is a prestressed concrete box beam or girders - multiple carrying SR 0376 EB over T.R. 535 Chapel RD in Beaver County, Pennsylvania. It was built in 1973 and reconstructed in 2011, so it is 52 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 11,363 vehicles a day, roughly 10% of them trucks, projected to reach 11,828 by 2032. The structure is 113 ft (34.4 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 0376 EB over T.R. 535 Chapel RD built?
It was built in 1973, making it 52 years old in 2025. It was reconstructed in 2011.
What condition is SR 0376 EB over T.R. 535 Chapel RD in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does SR 0376 EB over T.R. 535 Chapel RD carry?
About 11,363 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is SR 0376 EB over T.R. 535 Chapel RD?
The structure is 113 ft (34.4 m) long with a longest span of 50 ft (15.2 m) and a deck 44 ft wide.
Who owns SR 0376 EB over T.R. 535 Chapel RD?
It is owned by the State Highway Agency.