Tuscarawas Road over SR 0376 EB WB
GoodBeaver County, Pennsylvania · SR 4028 over SR 0060 · Structure no. 000000000046781
- Built
- 2011
- 14 years old
- Condition
- Good
- inspected September 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 269 ft
- 4 main spans
- Daily traffic
- 3,808
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Tuscarawas Road over SR 0376 EB WB is a prestressed concrete continuous box beam or girders - multiple carrying Tuscarawas Road over SR 0376 EB WB in Beaver County, Pennsylvania. It was built in 2011, so it is 14 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,808 vehicles a day, roughly 3% of them trucks, projected to reach 6,800 by 2032. The structure is 269 ft (82 m) long and 47 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Tuscarawas Road over SR 0376 EB WB built?
It was built in 2011, making it 14 years old in 2025.
What condition is Tuscarawas Road over SR 0376 EB WB in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does Tuscarawas Road over SR 0376 EB WB carry?
About 3,808 vehicles per day (2023 count), of which roughly 3% are trucks.
How long is Tuscarawas Road over SR 0376 EB WB?
The structure is 269 ft (82 m) long with a longest span of 68 ft (20.7 m) and a deck 47 ft wide.
Who owns Tuscarawas Road over SR 0376 EB WB?
It is owned by the State Highway Agency.