US Bridges

IR76 over I76RAMP W-5/SWEITZER/CSX

Good

Summit County, Ohio · 0.75 MI E of SR 59 · Structure no. 7703597

Built
2018
7 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
313 ft
3 main spans
Daily traffic
18,620
2017 count
Owner
State
State Highway Agency

About this bridge

IR76 over I76RAMP W-5/SWEITZER/CSX is a steel continuous stringer/multi-beam or girder carrying IR76 over I76RAMP W-5/SWEITZER/CSX in Summit County, Ohio. It was built in 2018, so it is 7 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 18,620 vehicles a day, roughly 7% of them trucks, projected to reach 18,620 by 2037. The structure is 313 ft (95.4 m) long and 55 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesIR76
CrossesI76RAMP W-5/SWEITZER/CSX
Location0.75 MI E of SR 59
RouteInterstate 76
StateOhio
Coordinates41.0627, -81.5251
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating68.9 US tons
Inventory rating53.2 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length313 ft (95.4 m)
Longest span115 ft (35 m)
Deck width55 ft (16.9 m)
Roadway width52 ft (15.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,620 (2017)
Projected traffic18,620 by 2037
Trucks7%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$84.2 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was IR76 over I76RAMP W-5/SWEITZER/CSX built?

It was built in 2018, making it 7 years old in 2025.

What condition is IR76 over I76RAMP W-5/SWEITZER/CSX in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does IR76 over I76RAMP W-5/SWEITZER/CSX carry?

About 18,620 vehicles per day (2017 count), of which roughly 7% are trucks.

How long is IR76 over I76RAMP W-5/SWEITZER/CSX?

The structure is 313 ft (95.4 m) long with a longest span of 115 ft (35 m) and a deck 55 ft wide.

Who owns IR76 over I76RAMP W-5/SWEITZER/CSX?

It is owned by the State Highway Agency.