I76/BDWY Sweitz over Ir 76 Ov Sweitzeravecsxt
GoodSummit County, Ohio · 0.70 MI E of SR 59 · Structure no. 7703252
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 216 ft
- 3 main spans
- Daily traffic
- 90,300
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
I76/BDWY Sweitz over Ir 76 Ov Sweitzeravecsxt is a steel continuous stringer/multi-beam or girder carrying I76/BDWY Sweitz over Ir 76 Ov Sweitzeravecsxt in Summit County, Ohio. It was built in 2018, so it is 7 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 90,300 vehicles a day, roughly 13% of them trucks, projected to reach 90,300 by 2037. The structure is 216 ft (65.7 m) long and 165 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I76/BDWY Sweitz over Ir 76 Ov Sweitzeravecsxt built?
It was built in 2018, making it 7 years old in 2025.
What condition is I76/BDWY Sweitz over Ir 76 Ov Sweitzeravecsxt in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does I76/BDWY Sweitz over Ir 76 Ov Sweitzeravecsxt carry?
About 90,300 vehicles per day (2017 count), of which roughly 13% are trucks.
How long is I76/BDWY Sweitz over Ir 76 Ov Sweitzeravecsxt?
The structure is 216 ft (65.7 m) long with a longest span of 80 ft (24.4 m) and a deck 165 ft wide.
Who owns I76/BDWY Sweitz over Ir 76 Ov Sweitzeravecsxt?
It is owned by the State Highway Agency.